- SR 534 Design Noise Study Report (2025)
- Concept, Feasibility & Mobility Study (2018) - Part 1
- Concept, Feasibility & Mobility Study (2018) - Part 2
- PD&E Reevaluation Study (2019)
- Preferred Alternative Approved by CFX board (2019)
- Northeast Connector Expressway (Phase 1) PD&E Study (2022) - PER
- Northeast Connector Expressway (Phase 1) PD&E Study (2022) - PEIR
- Northeast Connector Expressway (Phase 1) PD&E Study (2022) - ACER